Nord Engineers provided Structural Detailing for the petal-shaped RHS tube domes of the War Memorial. The project involved two domes with diameters of 9.45 m and 10.52 m, creating a distinctive architectural statement with a blend of open and closed petal geometry.
The petal-shaped dome geometry required precise structural detailing to support the mix of open and closed petals while maintaining stability and constructability.
Nord Engineers delivered fabrication-ready structural detailing for the RHS tube framework, preserving the architectural intent of the 9.45 m and 10.52 m domes with accurate geometry and connection details.